SLRP (Static Residential Load Profile)
The Static Residential Load Profile (āSRLPā) is a standard profile assigned to households, as they tend to have similar usage patterns, and vary only in the usage volume. For households installed with a Cumulative Meter, SP Group uses the SRLP, with weights for each half hour of a day, to approximate the householdās monthly usage to a half-hourly usage. This data is used for billing purposes.
The SRLP is determined and reviewed annually by the Energy Market Authority (āEMAā).
AMI (Advanced Metering Infrastructure)
Currently, there is a nationwide drive to adopt AMI meters throughout the island. This initiative will most likely be completed some time in 2023. If you wish to obtain your half-hourly meter readings, you may opt to install an AMI meter in advanced. It cost $40 before gst for installation fee and is chargeable by SP Group. It also takes approximately 30 days to install an AMI meter.
Once your AMI meter has been setup, you can view your half-hourly consumption on your SP Group app but do note that there is a 7-9 hours delay.
SLRP (Static Residential Load Profile)
The Static Residential Load Profile (āSRLPā) is a standard profile assigned to households, as they tend to have similar usage patterns, and vary only in the usage volume. For households installed with a Cumulative Meter, SP Group uses the SRLP, with weights for each half hour of a day, to approximate the householdās monthly usage to a half-hourly usage. This data is used for billing purposes.
The SRLP is determined and reviewed annually by the Energy Market Authority (āEMAā).
AMI (Advanced Metering Infrastructure)
Currently, there is a nationwide drive to adopt AMI meters throughout the island. This initiative will most likely be completed some time in 2023. If you wish to obtain your half-hourly meter readings, you may opt to install an AMI meter in advanced. It cost $40 before gst for installation fee and is chargeable by SP Group. It also takes approximately 30 days to install an AMI meter.
Once your AMI meter has been setup, you can view your half-hourly consumption on your SP Group app but do note that there is a 7-9 hours delay.